Customer :
SEPTA
Project Description:
Engineer: SEPTA Engineering
Installing Contractor: Devine Brothers
These units were designed and specified by SEPTA for their Allgheny Garage Maintenance facily. 8 TMI Climate Solutions Custom Heat Recovery units were provided. The Units ranged from 14,000 to 28,000 CFM.
Features include:
- Outdoor construction
- Units shipped in a single piece for mounting on existing curbs
- Panel Thickness & Type: 2" Injected Foam - Gasketed Thermal Break
- Exterior Liner: 14 ga. Aluminum
- Interior Liner: 18 ga. Aluminum
- Floor Liner: 8 ga. (0.125") Aluminum Checkerplate
- Underfloor Liner: 18 ga. (0.040") Aluminum
- Unit Base: 6" Painted Carbon Steel - Structural C-Channel
- Floors insulated with 3" foam (R-19.5)
- Heat Pipe Technologies Heat Pipes
- Yaskawa VFD's