Customer :
L.F. Driscoll
Project Description:
(23) Energy Labs Air Handling Units for the New Reading Hospital Ranging from 10,000 CFM to 50,000 CFM. The new Units served the Operating Rooms and patient Rooms
Units include:
- All Aluminum No Through Metal Construction
- Fan Arrays
- Chilled water Pre and Post Cooling
- SEMCO Energy Recovery Wheels and Passive Dehumidification Wheels
- Outside Air Flow Measuring Stations
- Humidifiers
YSAKAWA Variable Frequency Drive
- UV Resources UV Lighting
- Multiple Access points
- Fan Motor Removal system
- Multiple filtration sets
Project: Reading Hospital
MEP: Ballinger
CM: L.F. Driscoll