Customer : L.F. Driscoll


Project Description:

(23) Energy Labs Air Handling Units for the New Reading Hospital Ranging from 10,000 CFM to 50,000 CFM. The new Units served the Operating Rooms and patient Rooms
Units include:

  • All Aluminum No Through Metal Construction
  • Fan Arrays
  • Chilled water Pre and Post Cooling
  • SEMCO Energy Recovery Wheels and Passive Dehumidification Wheels
  • Outside Air Flow Measuring Stations
  • Humidifiers
  • YSAKAWA Variable Frequency Drive
  • UV Resources UV Lighting
  • Multiple Access points
  • Fan Motor Removal system
  • Multiple filtration sets

Project: Reading Hospital
MEP: Ballinger
CM: L.F. Driscoll